Shanco’s first project win with Rosti Automotive

Rosti are an international injection moulding company with a manufacturing facility in North Yorkshire. They needed to extend their existing service yard and consulted with the Structural Engineer on the project to recommend a groundworks company that could complete the job whilst working around a live manufacturing site. The structural engineer recommended us, having worked with us on several other projects.
 

The project was quite large and involved bulk earthworks, draining construction and concrete yard construction which had to be completed in 10 weeks. Working around a live site meant works were carefully sequenced and material delivery meticulously coordinated.
 

The yard had to be constructed over an existing drainage ditch, which meant a full reshape of the ditch was required and then the installation of a further 300mm diameter drainage system to carry any surface water away to the onsite attenuation pond.
 

The sequencing of the works was critical due to the manufacturing facility being fully operational – with the drainage works being carried out first and all the materials in and out of site coming through via a single access point adjacent to the site. Followed by the completion of the 1400m2 reinforced concrete yard.

Following on from a successful project completion the client has asked us to look at additional works within the same facility.

Contact Us

  • LinkedIn

Shanco provides a national service and guarantees a quick response to your enquiries to help you meet your project deadlines.

Contact us to discuss your requirements and discover how our team can add value to your project.

Shanco Contracts Limited
 

Unit 3 Flass Lane,
Cutsyke Junction,
Castleford,
WF10 5JW

 

Telephone: 01977 515 133

Email: enquiries@shanco.co.uk

Upload Images

Thanks for submitting!

bottom of page